01

Preparation Of Temporary Facilities And Equipment

  • Construct material storage areas, work zones, and sanitation facilities
  • Prepare necessary equipment such as cranes, welding machines, cutting machines, drilling machines, and hand tools
  • Establish temporary electrical, water supply, and drainage systems
Prepare necessary equipments

02

Material Transportation to the Construction Site

  • Monitor and inspect supplies upon delivery to the construction site
  • Verify the quantity and quality of supplies in accordance with the contract
  • Organize, arrange, and unload materials in the designated storage area
Deliver supplies to the construction site

03

Unloading, Handling, And Storage Of Materials

  • Unload supplies from transport vehicles
  • Inspect, categorize, and mark each type of material
  • Store supplies to prevent moisture, mold, and damage from weather conditions
Unload, inspect and store supplies

04

Installation Of Anchor Bolts

  • Prepare concrete foundations according to the design drawings
  • Install foundation bolts, ensuring precision and stability
Anchor bolt installation

05

Erection Of Steel Structure

  • Install columns, trusses, beams, and crossbars according to the design drawings
  • Use cranes and assembly tools to position steel components at connection points
  • Use welding machines, drills, and bolt-tightening tools to connect steel parts with bolts and welds
  • Check the vertical alignment, level, and straightness of the steel structure
Steel structure erection

06

Install Roof Sheets

  • Install roofing sheets following technical guidelines
  • Use specialized bolts or screws to secure the roofing sheets
  • Utilize accessories such as gutters, rain guards, and sun shields
  • Inspect for watertightness, waterproofing, and the slope of the roof to ensure proper drainage
Roof sheet installation phase 1
Roof sheet installation phase 2

07

Install Wall Sheets

  • Install wall panels according to technical guidelines
  • Use accessories such as doors, windows, and partitions
  • Check the flatness and watertightness of the wall panels to ensure aesthetics and waterproofing
Wall panel installation

08

Finish & Handover

  • Inspect the entire structural system, including the roof and walls, to ensure quality and aesthetics
  • Finish detailing work on smaller items such as doors, ventilation openings, and accessories
  • Hand over the project to the client
Final completion and handover

09

Warranty

Support for maintenance or repairs in case of structural or material issues during the warranty period.

Warranty