01

Conceptual Design

  • Listening to and accurately understanding the investor’s needs and expectations
  • Assessing project requirements and technical specifications
Develop ideas

02

Proposal Drawings

  • Evaluating technical and financial factors to propose optimal design and construction solutions based on the initial analysis
  • Recommending the most suitable structural options, materials, and construction timeline for each project
  • Advising clients on the features, advantages, and costs of each option to support the investor in making well-informed decisions
Propose solutions

03

Contract Awarded

  • Drafting a contract with detailed terms regarding time commitments, costs, and quality
  • Reaching an agreement on construction procedures, timelines, and the rights and benefits of both parties
  • Signing the contract to formalize the commitments between both parties
Contract signing

04

Detail Drawings

  • Finalizing detailed technical drawings after contract signing
  • Developing a production plan and detailed fabrication schedule
  • Monitoring and inspecting each production phase to ensure construction progress aligns with the timeline
Implement technical plans

05

Fabrication

The fabrication process includes 8 main steps:

  • Steel cutting
  • Steel welding
  • Assembly of components
  • Shot blasting
  • Painting
  • Galvanized purlins/girts, wall and roof sheeting
  • Technical inspection and packaging before shipment
  • Loading process
Fabrication

ATEC is committed to ensuring that 100% of products undergo a thorough inspection at the factory before being transported to the construction site, guaranteeing the highest quality following international standards.

06

Erection

  • Assembling steel components according to the approved design drawings
  • Conducting strict inspection and supervision of the entire erection process to ensure precision at every assembly stage, from small details to the complete structural framework
  • Ensuring construction progress and on-site safety align with the planned
Erection

07

Warranty

  • Conducting regular quality inspections after project completion
  • ATEC is committed to providing warranty and technical support throughout the warranty period
Warranty

Get Consultation and Quotation